Observers must record a minimum of one random soft start per swing.

For each one that is measured enter the date, time of start, time of full power, duration, and start of line time in the top rows.  Volume of the array in cubic inches is entered every minute of the soft start.

The graph on the right is updated automatically.

SOFT-STARTSOFT-START

error: Content is protected !!